Installation (continued)
7. Provide a suitable barrier around the work area, e.g. a guard rail.
8. Make sure you have a clear path of retreat!
9. Use safety helmet, safety goggles and protective shoes.
10. All personnel who work with sewage systems must be vaccinated against diseases to
which they may be exposed.
11. A first-aid kit must be close at hand.
12. Note that special rules apply to installation in explosive atmosphere.
Follow all other health and safety rules and local codes and ordinances.
12
1GA/2GA Installation, Operation and Maintenance Manual