FAAC 402 Installation Manual

FAAC 402 Installation Manual

Swing gate system
Hide thumbs Also See for 402:

Advertisement

Installation Manual
402
Swing Gate System
Leading the way ...
Leading the way ...
Leading the way ...

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 402 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for FAAC 402

  • Page 1 Installation Manual Swing Gate System Leading the way ... Leading the way ... Leading the way ...
  • Page 2: Table Of Contents

    Symbol draws your attention to the notes about the product’s characteristics or operation. FAAC S.p.A. Via Benini, 1 40069 Zola Predosa (BO) - ITALIA Tel.: 051/61724 - Fax: 051/758518...
  • Page 3: Ec Declaration Of Conformity For Machines

    17) FAAC declines all liability as concerns safety and efficient operation source of danger. of the automated system, if system components not produced by 6) FAAC declines all liability caused by improper use or use other than that FAAC are used. for which the automated system was intended.
  • Page 4: Description And Technical Specifications

    These instructions apply to the following models: 1.1. DIMENSIONS 402 CBC - 402 SBS The FAAC 402 automated system for swing leaf gates consists of an enbloc composed of an electric pump and a hydraulic piston Fig. 2 which transmits drive to the leaf.
  • Page 5: Installing The Automated System

    3.2.1. GENERAL RULES FOR DETERMINING THE INSTALLING THE AUTOMATED SYSTEM INSTALLATION DIMENSIONS 3.1. PRELIMINARY CHECKS If the dimensions indicated in table A or B cannot be executed, the following must be considered in order to determine different To ensure a correctly operating automated system, the structure measurements: of the existing gate or gate to be built must satisfy the following to obtain 90°...
  • Page 6 Secure the operator to the rear attachment with the supplied screws (Fig. 6), taking care to position the operator Fig. 8 with the BY-PASS screws facing up and the consequent RELEASE screw facing the ground. Release the operator (see chapter 7). Fully remove the rod to its stop point and make it recede by about 5 mm (Fig.7).
  • Page 7: Start-Up

    - the green screw controls opening movement torque. To increase torque, turn the screws clockwise. To reduce torque, turn the screws anti-clockwise. When you have finished adjusting, apply the label with the FAAC logo, using the self tapping screws (FIG.12). Fig. 12...
  • Page 8: Final Operations

    - To re-lock the operator, turn the key clockwise until it stops (Fig. 10. REPAIRS 15). - Lastly, remove the key and restore the power supply to the system. For any repairs, contact FAAC’s authorised Repair Centres.
  • Page 9: Troubleshooting

    11. TROUBLESHOOTING The following table will help you identify and solve some particular conditions. CONDITION SUGGESTION - Check if mains power is supplied. - Make sure that the operator is not unlocked. (chapter 8.). - Check the adjustment of the anti-crushing system (paragraph 4.1). Gate not moving.
  • Page 11 402 CBC - 402 SBS. RESTORING NORMAL OPERATION MODE The FAAC 402 automated system for swing leaf gates consists of a To prevent an involuntary pulse from activating the operator during hydraulic enbloc composed of an electric pump and a hydraulic the manoeuvre, cut power to the system before re-locking the piston which transmits drive to the leaf.
  • Page 13 The descriptions and illustrations contained in this manual are not binding. FAAC reserve the right, whilst leaving the main features of the main equipment unaltered, to undertake any modifi cations it holds necessary for either technical or commercial reasons, at any time and without revising the present publication.

Table of Contents

Save PDF