FAAC 760 Installation Manual
FAAC 760 Installation Manual

FAAC 760 Installation Manual

Gate operator and control panel
Hide thumbs Also See for 760:

Advertisement

The 760 Operator and
450 MPS Control Panel:
Installation Manual
Contents
Important Safety Information ............................................................ 2
Technical Data ............................................................................... 4
The 760 Operator............................................................................ 4
The Control Panel........................................................................... 4
Unpacking the Operator ................................................................... 5
The 760 Swing Gate Operator ........................................................... 6
General Characteristics .................................................................... 6
450 MPS Logic Modes .................................................................... 6
Installation Instructions.................................................................... 9
Preparing the Gate .......................................................................... 9
Manual Release.............................................................................10
Installing the 760 Operator ..............................................................10
Install the Load Bearing Box............................................................10
Secure the Load Bearing Box...........................................................11
Install the Gate Leaf Shoe................................................................11
Install the Gate Leaf .......................................................................14
Install the Operator in the Load Bearing Box......................................14
Install the 450 MPS Control Panel ....................................................16
Connect the Main Power Supply............................................16
Connect the Operator(s) to the Control Panel.............................17
Check the Motor's Direction of Rotation...................................19
Connect Other Devices.......................................................19
Set Operating Controls........................................................21
Fine-tune the Bypass Valve Pressures ...............................................22
Adjust the Beginning of the Braking Phase ........................................23
Adjust the Braking Intensity ............................................................23
Assemble and Install the Manual Release ..........................................23
Installing an Extension Arm.............................................................25
Maintenance .................................................................................26
The 760 Operator...........................................................................26
The Control Panel..........................................................................26
Troubleshooting ............................................................................27
Exploded View, 760 Splined Shaft....................................................28
Exploded View, 760 CBAC-SB-SBS.................................................29
Exploded View, 760 CR..................................................................30

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 760 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for FAAC 760

  • Page 1: Table Of Contents

    Technical Data ................4 The 760 Operator................4 The Control Panel................4 Unpacking the Operator ..............5 The 760 Swing Gate Operator ............6 General Characteristics ..............6 450 MPS Logic Modes ..............6 Installation Instructions..............9 Preparing the Gate ................9 Manual Release................10...
  • Page 2: Important Safety Information

    Important Safety Information Both the installer and the owner and/or operator of 1. A gate is a potential traffic hazard, so it is important this system need to read and understand this that you locate the gate far enough away from the installation manual and the safety instructions road to eliminate the potential of traffic getting supplied with other components of the gate system.
  • Page 3 When using any electrical equipment, observe some 8. To guarantee the efficiency of this equipment, the fundamental rules: manufacturer recommends that qualified personnel periodically check and maintain the equipment. U.L. Class and FAAC Operator Duty Cycle Typical Use Model Class I: Residential Vehicular Gate Operator •...
  • Page 4: Technical Data

    U.L. recognized installation. The control panel: 450 MPS can be used to control a single 760 operator or a dual (biparting) system. Both the control panel and Label reads: 1450MPSUS = 220 VAC the operator must use the same power supply voltage.
  • Page 5: Unpacking The Operator

    Unpacking the Operator When you receive your 760 Operator, inspect the Load Bearing Box: shipping boxes for physical damage such as leaking oil or a torn carton. Then inspect the operator, the mounting box, and the control panel after you remove them from the boxes.
  • Page 6: The 760 Swing Gate Operator

    General Characteristics the Standard model of the 760 Operator and allows you The 760 Operator with G e n t l e S w i n g Motion to operate the gate by hand from either side of the gate Management is a medium-duty operator designed to (see Figure 6).
  • Page 7 A (Automatic) Logic Gate Open A Open B Stop Opening Closing Warning Status Reversing Reversing Light Device(s) Device(s) Closed Opens both leaves Opens single leaf No effect No effect No effect and closes them connected to after pause time Motor 1 and closes it after pause time Opening...
  • Page 8 E (Semi-automatic) Logic Gate Open A Open B Stop Opening Closing Warning Status Reversing Reversing Light Device(s) Device(s) Closed Opens both leaves Opens single leaf No effect No effect No effect connected to Motor 1 Opening Stops Stops Stops Stops; gate closes No effect when reversing device no longer...
  • Page 9: Installation Instructions

    This manual does not instruct you in designing a gate, installing a gate, or basic electrical wiring. The installation tasks discussed in this manual are tasks particular to the 760 Operator. Preparing the Gate Before you install the 760 Operator, you must insure that the gate leaf meets the following criteria.
  • Page 10: Manual Release

    Although the Install the gate leaf • 760 SB and the 760 SBS come with this release Install the operator in the load bearing box • mechanism, it is not necessary to use this feature Install the control panel •...
  • Page 11: Secure The Load Bearing Box

    1. The center of the splined shaft of the pinion bolts do not interfere with the 760 Operator yet to be must align perfectly with the axis of rotation for installed in the box.
  • Page 12 • Install a length of appropriately sized pipe Axis of rotation of the gate leaf between the splined collar of the operator and Weld this end of this pipe to the gate leaf shoe. • the bottom of the gate leaf Construct a shear-pin assembly to shoe, being certain you have accommodate the extra vertical distance.
  • Page 13 and mark the position for the placement of the vertical section of the shoe. Absolute minimum of 5 in. (12.7 cm) between vertical section and end of U-shaped section Vertical section can be located on either side of axis of rotation Centerline of gate leaf Axis of rotation...
  • Page 14: Install The Gate Leaf

    Next, remove the plugs holding the rack cover to the 760 Operator (see Figure 14). Be sure to keep track of The greater the arc of swing in your gate leaf (the closer the plugs and the rack and pinion covers in case you you are to the maximum swing of 148 degrees), the ever need to remove the operator for repair.
  • Page 15 Turn both screws counter-clockwise all the in the bottom of the 760 Operator (see Figure 16). Mate way. Later you will adjust these pressures. the rack in the operator to the pinion in the mounting box.
  • Page 16: Install The 450 Mps Control Panel

    E 4 X 14 AWG up 7 Switch for 760 Operator to 414 ft (126 m) 8 Radio receiver Figure 18. Typical layout of gate system with 760 Operators Install the 450 MPS Connect the Main Power Supply Control Panel...
  • Page 17: Connect The Operator(S) To The Control Panel

    J1 terminal block for main power supply Leaf delay potentiometer J2 terminal block for connecting the operator(s) DIP switch assembly J3 terminal block for low-voltage accessories Fuses 220 VAC 115 VAC J4 quick connector port F1, Main power 10 A Pressure adjustment potentiometer F2, Accessories 800 mA...
  • Page 18 Figure 20. The terminal strip wiring of the 450 MPS with photobeams Figure 21. Wiring detail (a) inside the junction box and (b) from the junction box or operator to the high-voltage terminal strip on the 450 MPS control panel...
  • Page 19: Check The Motor's Direction Of Rotation

    Disengage the operator(s) with the Manual Release key, Note: UL does not recognize the FAAC system with and open the gate by hand about halfway (See Figure 3). loop detectors or safety edges. FAAC photobeams must Next, engage the operator(s) with the Manual Release be used to comply with UL 325.
  • Page 20 Figure 22. Common accessories wired to 450 MPS.
  • Page 21: Set Operating Controls

    Note: If you are using both a receiver and a See Figure 22 for the wiring of a magnetic locking decoder, hard wire the decoder and plug the device. receiver in. Warning Light: Connect a warning light to terminals Open/Hold Open Device: To open and hold open the 22 and 23 in the group labeled W.LIGHT in terminal gate, an Open/Hold Open device must make a set of block J3.
  • Page 22: Fine-Tune The Bypass Valve Pressures

    Fine-tune the Bypass Valve Pressures Torque: The torque potentiometer on the 450 MPS must be turned all the way clockwise for the 760 The pressure a gate leaf applies to an obstacle in its path Operator. The potentiometer controls voltage to the is determined by the bypass valve adjustment.
  • Page 23: Adjust The Beginning Of The Braking Phase

    Note: If your gate leaf opens less than 90 deg, setting the beginning of the braking phase may have no effect Note: The 760 Operator ships from the factory with the on the gate leaf. The only way to adjust the beginning of...
  • Page 24 Figure 26. Install the Manual Release mm hex head on the visible end. You need to slide this mechanism hex head into the brass fitting of the 760 Operator that is located on the same end as the bypass valve adjustment screws (see Figure 29).
  • Page 25: Installing An Extension Arm

    Extension bar collar slides within extension U Hole in the extension bar fits around and is welded to the outside of the sleeve of the splined shaft Figure 27. The 760 Extension Arm, (a) side view and (b) top view...
  • Page 26: Maintenance

    To check the oil level correctly, remove the oil filler cap To bleed the hydraulic system of air that might cause on the 760 Operator. The oil level should be at or just bouncy or jerky operation do the following: below the opening of the filler hole.
  • Page 27: Troubleshooting

    If it does not of your model of operator. For example, because the 760 illuminate and if the batteries are okay, repair or replace CBAC has a rated opening time of 17 sec, you should the transmitter.
  • Page 29: Exploded View, 760 Cbac-Sb-Sbs

    UL strain relief kit (2167A*): 710914 710915 709020002 703930...
  • Page 31: Limited Warranty

    Neither FAAC S.p.A. or FAAC International, Inc., assumes nor authorizes any person to assume for them any other liability in connection with the sale or use of the products of FAAC S.p.A. or FAAC International, Inc.

This manual is also suitable for:

450 mps

Table of Contents

Save PDF