Assembly Assemblage - Ironman Fitness ATIS 4000 Owner's Manual

Ab training inversion system
Table of Contents

Advertisement

1
Lay Frame on the floor
Cover the floor with soft
material to prevent scratching
the frame or floor.
Déposez le cadre sur le sol.
Couvrez le sol d'un tissu doux
pour éviter d'égratigner le
cadre ou le plancher.
2
3
52 Bolt (M8 x 20) / 8 pc
52 Boulon (M8 x 20) / 8 pc
68 Washer (8.5 x 20 x 1.5) / 7 pcs
68 Rondelle (8.5 x 20 x 1.5) / 7 pc
ASSEMBLY
ASSEMBLAGE
11
52 Bolt (M8 x 20) / 8 pc
52 Boulon (M8 x 20) / 8 pc
72 Curve Washer (M8) / 8 pc
72 Curve Washer (M8) / 8 pc
60 Bolt (M6 x 20) / 2 pc
60 Boulon (M6 x 20) / 2 pc
69 Washer (6 .5 x 16 x 1) / 2 pc
69 Rondelle (6 .5 x 16 x 1) / 2 pc
32 Foot Stabilizer
32 Stabilisateur de pied
51 Bolt (M8 x 40) / 5 pc
51 Boulon (M8 x 40) / 5 pc

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5903

Table of Contents