Installation flow chart
BEGIN
Power up lift
for installation
Install hall calls
(as required)
Reverse power cord
(if required)
Multilift Installation Guide
Double-check
Unpack and
site specifics
verify shipment
Anchor lift to
Anchor lift to
limit switches
pad/floor
pad/floor
(as required)
Wind gate
Adjust gate
spring hinges
closer (as required)
Reverse automatic
access ramp
(if required)
Verify cab type
(handing)
Adjust
Install landing
gate or door
Permanently install
battery (batteries)
Disassemble/
Before leaving
reassemble
acme screw
(if required)
Position lift
Install locks
and operators
(as required)
Verify operation
END
job site
Part No. 000643, 26-m02-2013