Step 9

Install locks and operators (as required)

Install the locks and operators (as required).
Procedure
The installation of locks and operators is specific for each
job site.
For installation of all locks, refer to the VPL Lock Installation
Guide P/N 000696.
For installation of the Anny Gate Operator, refer to the
Anny Gate Operator Installation Guide P/N 000697.
For installation of other operator types, refer to the
documentation that comes with the operator.
Part No. 000643, 26-m02-2013
Step 10

Install hall calls (as required)

Install the hall calls as required.
Procedure
The hall calls may be flush mount, surface mount or in
frame, depending on the job specifications. Refer to the
drawings provided in Appendix A.
NOTE
The installation of hall calls is specific to each job site.
Refer to the section 'Hall Calls' in Appendix A for
illustrations of the various types of hall calls.
1
Mount the hall call at each landing using the hardware
supplied with the hall call.
2
Route the wiring from the hall call in to the tower.
3
Route the wiring to the controller and connect per the
wiring diagrams shipped with the lift.
Figure 17
Sample Hall Calls
4.5"
3.75"
3"
3"
2.25"
9.4"
2.4"
Page 13
4.5"
Flush mount
2.5"
Surface mount
6"
In frame
Multilift Installation Guide