Installation - Motorola PTP 300 Series User Manual

Point-to-point wireless bridge
Hide thumbs Also See for PTP 300 Series:
Table of Contents

Advertisement

6 Installation

This section provides instructions for installing a PTP 300 link.
It is advised that the link be configured and tested on a bench before the final installation of
the units on site. Providing it is safe to do so, the installer should take the bench testing
process to the point where a radio link is established. For more information, see the
Deployment Guide.
CAUTION
Motorola recommends that only qualified personnel undertake the installation of a
PTP 300 Series Bridge solution.
We recommend that the practices and procedures detailed in the Motorola manual
R56
(68P81089E50) be applied to all new site build activities. This manual is provided on
the PTP 300 CD-ROM.
The standard PTP 300 Series installation procedure consists of the following stages:
1. Prepare for installation as described in Section 6.3 "Preparation".
2. Mount the ODUs as described in Section 6.4 "Mounting the ODU
3. Connect the equipment as described in Section 6.5 "Connecting Up".
4. Establish a radio link as described in Section 6.6 "Establishing a Radio Link".
Depending upon the options required, see also the following sections:
1. If a connectorized PTP 300 variant is to be installed, see Section 10 "Connectorized
PTP 300 Series Bridge".
2. If an E1/T1 link is to be installed, see Section 11 "E1/T1 Installation Guide".
3. If the link is to be encrypted, see Section 13 "AES Encryption".
4Gon www.4Gon.co.uk info@4gon.co.uk Tel: +44 (0)1245 808195 Fax: +44 (0)1245 808299
"STANDARDS
AND
GUIDELINES
FOR
COMMUNICATION
47
6 Installation
SITES"
".
s

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ptp 500 series

Table of Contents