PEERLESS Series 211A Installation, Operation & Maintenance Manual page 6

Gas boilers-water
Table of Contents

Advertisement

PREINSTALLATION
i. Where communicating directly or through
vertical ducts with the outdoors each opening
shall have a minimum free area of 1 in
4000 Btu/hr (22 cm
input rating for all equipment in the space.
See Figure 1.4 for openings directly
communicating with the outdoors or Figure
1.5 for openings connected by ducts to the
outdoors.
Figure 1.4: Air Openings – All Air Directly from
Outdoors
Figure 1.5: Air Openings – All Air from Outdoors
through Vertical Ducts
ii. Where communicating with the outdoors
through horizontal ducts, each opening shall
have a minimum free area of 1 in
Btu/hr (22 cm
input for all appliances in the space. See
Figure 1.6.
4
2
per
2
per 4000 W) of total
2
per 2000
2
per 2000 W) of total rated
Figure 1.6: Air Openings – All Air from Outdoors
through Horizontal Ducts
b. One Permanent Opening Method: Provide
one permanent opening beginning within 12
inches (305 mm) of the top of the space. The
opening shall communicate directly with the
outdoors, communicate through a vertical or
horizontal duct, or communicate with a space
that freely communicates with the outdoors.
The opening shall have a minimum free area of
1 in
2
per 3000 Btu/hr of total rated input for all
appliances in the space and not less than the
sum of the cross-sectional areas of all vent
connectors in the space. The gas-fired equipment
shall have clearances of at least 1 inch (25 mm)
from the sides and back and 6 inches (150 mm)
from the front of the appliance. See Figure 1.7
for this arrangement.
Figure 1.7: Air Openings – All Air from Outdoors
through One Opening

Advertisement

Table of Contents
loading

Table of Contents