Hood Assembly - Harsco Industrial MACH C750 Installation & Owner's Manual

Gas-fired boiler
Hide thumbs Also See for MACH C750:
Table of Contents

Advertisement

®
MACH
Boiler Size
C-750,C-900,C-1050
Stainless Steel Adapter for CPVC Vent
F441 Schedule 40 pipe & ASTM F439 Schedule 80 fittings. Cement and primer must conform to
ASTM F493.
Failure to comply may result in failure of venting system. This may cause severe injury or death.
Use approved high temperature silicone between the adapter and exhaust connections.
®
See MACH
C750-C1050 Installation & Owner's Manual for additional information.
2.6
H
A
OOD
SSEMBLY
See Drawing # BP00000218
1. Place hood assembly (ITEM #3) on boiler with
the stack hole facing the back of the boiler.
2. The hood will rest on the 4 angle brackets (inside the hood).
3. The 4 rectangular spacers will be on the sides of the cabinet.
4. Assemble the exhaust vent and place it through the hood
then into the exhaust outlet on the boiler.
5. There are 4 holes located on the sides of the hood. Insert (4)
¼" quick release pins (ITEM #2), through the hood into the
cabinet until the pin is locked in place.
6. Secure & seal exhaust venting. See section 2.4
Nominal Stack
Stainless Adapter for CPVC Vent
Size
Supplier / Part Number
8"
Heat-Fab / 9801PKCPVC
When constructing a venting system from CPVC, use only CPVC ASTM
8
®
MACH
C750-C1050 Outdoor Boilers
Position exhaust
pipe in center of
hood gasket.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mach c900Mach c1050

Table of Contents