Field Installed Components; Install Power Cord Seal; Gas Inlet Assembly - Harsco Industrial MACH C750 Installation & Owner's Manual

Gas-fired boiler
Hide thumbs Also See for MACH C750:
Table of Contents

Advertisement

2 Field Installed Components

2.1
I
P
NSTALL
OWER
(Customer Supplied)
For this OUTDOOR boiler use water proof conduit and sealtight connectors to the boiler. Before starting the
boiler, check to ensure that the proper electrical service is connected to the boiler.
electrical requirements and diagrams. Incorrect electrical connections may result in severe injury or
death.
2.2
G
I
A
AS
NLET
SSEMBLY
See Drawing # BP00000218
1.
Remove gas shut-off valve.
2.
Assemble one (1) 1" street 90º elbow (item #1) to
outlet of boiler and assemble gas shut-off valve to the
elbow. This allows clearance for the air inlet stack.
Use approved pipe sealer that resists the action of
Fuel Gases such as Natural Gas or LPG. DO NOT
USE Teflon™ tape.
Installation & Owner's Manual for specific gas connection
requirements and diagrams. Incorrect gas connections may
C
S
ORD
EAL
Use water-
proof
conduit &
seal tight
connector
®
See MACH
C750-C1050 Installation & Owner's Manual for specific
®
See
MACH
MACH
C750-C1050
90º street elbow
5
®
C750-C1050 Outdoor Boilers