GE 20 kW Home Installation And Start-Up Manual page 20

Home generator systems
Table of Contents

Advertisement

to open roof:
1. Insert key into lock
down on roof above the lock to aid in turning the key.
Turn key one quarter turn clockwise.
2. Lift roof to the open position.
to remove front panel:
1. Remove the two bolts
unit.
2. Lift panel to remove from unit.
to secure front panel:
1. Place panel in unit.
2. Secure the panel with two bolts.
B
A
20
A
of front panel. Gently push
that secure the panel to the
B
to remove rear panel:
1. Ensure the roof is in the open position.
2. Remove the two bolts
unit.
3. Lift panel to remove from unit.
to secure rear panel:
1. Slide panel into place on unit.
2. Secure the panel with two bolts.
to remove battery panel:
1. Ensure the roof is in the open position.
2. Remove the two bolts
unit.
3. Lift up on panel and remove.
to secure battery panel:
1. Place panel in unit.
2. Secure the panel with two bolts.
C
that secure the panel to the
C
that secure the panel to the
D
D

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents