Booting Switch; Checking Before Powering On Switch; Powering On Switch - Huawei Quidway S3026C-PWR Installation Manual

Hide thumbs Also See for Quidway S3026C-PWR:
Table of Contents

Advertisement

Installation Manual
Quidway S3026C-PWR Ethernet Switch
Figure 4-6 Setting terminal emulation in properties setting window

4.4 Booting Switch

4.4.1 Checking before Powering on Switch

Before powering on a switch, check whether:
The power cord and ground wire are correctly connected.
The voltage matches the requirement for the switch.
The Console cable is correctly connected the terminal (which can be a PC) for
configuration has been started, and the configuration parameters have been
set.

4.4.2 Powering On Switch

After powering on the switch, run Boot ROM program first and the following
information will be displayed:
Starting...
************************************************
*
Huawei Technologies Proprietary
4-5
Chapter 4 Initial Power On
*

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents