Install The Top End Cap; Adjust The Tracking Rollers - ThyssenKrupp Access Citia Installation And Service Manual

Alternating current systems stair lift
Table of Contents

Advertisement

k. InSTall The Top end Cap
route the power wire
out through the
bottom of the end
cap.
IT IS CRUCIAL
that the power
wire fit into the
recessed area of
the end cap on
its way out. If it
is anywhere else
the wire will pinch
and may possibly
short out.
end cap
Track
Power Wire
Junction Box
Bottom View
of end cap
end cap
Track
Power Wire
Side View of end cap
14
Wire MUST
fit in this
area
To help further explain
the power wire
placement, refer to the
illustrations below. The
side view features a
cutaway of the side of
the end cap to reveal
how the power wire is
routed out of the track,
into the end cap and
down under the track.
The bottom view shows
how the power wire
runs under the track,
down the center to the
junction box.
Junction Box
M. adJuST The TraCkIng rollerS
loosen locknuts on take-up assembly
using a wrench, tighten jack-nuts against the chassis.
The gear set wheel should now be tight against the
track.
Tighten locknuts.
Take care in tightening locknuts. The take up assembly
should be level with the track.
Track and Chassis (bottom View)
locknuts
Bottom of Track
Take-up assembly
(bottom View, Track in place)
Jack-nuts
Gear set Wheel
chassis
Take-up assembly
locknuts
Bottom of Track
Take up Wheels

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for ThyssenKrupp Access Citia

This manual is also suitable for:

Aveya

Table of Contents