Mercury Optimax 115 Service Manual page 350

Direct fuel injection
Hide thumbs Also See for Optimax 115:
Table of Contents

Advertisement

IMPORTANT: Attach Vise Grip pliers to armature shaft before installing frame as-
sembly. The Vise Grip pliers will prevent the armature from being drawn out of the
brush card assembly by the frame magnets while installing the frame assembly.
3. Install Vise Grip
4. Carefully install frame assembly over armature.
5. Position harness retainer hole over tab in end cap.
6. Secure frame assembly to end cap with 2 screws.
a -
b -
c -
d -
e -
g -
h -
90-855347R1 JANUARY 1999
pliers on armature shaft.
i
g
c
b
Vise Grip
Pliers
Armature Shaft
O-ring
End Cap
Harness Retainer
f -
Retainer Hole
O-ring
Frame Assembly
i -
Screws
h
e
f
i
d
a
53776
POWER TRIM
Page 5B-45

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optimax 135Optimax 150Optimax 175

Table of Contents