Evaporator Unit Installation; Installing To Ice Storage And Transport Bin, Top Mount - Follett MC825 Series Installation, Operation And Service Manual

Icemaker with remote condensing unit
Table of Contents

Advertisement

Install evaporator unit
Installation overview
The evaporator is designed to be installed in the
following applications:
1. Ice storage and transport bins, top-mount (Fig. 1.1).
2. VU155 or VU300 series ice and beverage dispensers
(Fig. 1.2).
Installation checklist
The following are used for all installation applications:
❒ Locate and level unit
❒ Routing and mounting ice transport tubes
❒ Routing and mounting bin thermostat
❒ Plumbing for water
❒ Plumbing for drain
❒ Routing and connecting refrigerant lines
❒ Start up and testing
Installing to Ice storage and transport bins, top-mount
Mount evaporator unit
1. Verify bin top is level.
Note: Do NOT weld or permanently attach evaporator unit.
Removal may be necessary for service.
2. Position icemaker on bin.
a) If new storage bin and icemaker, position icemaker with
connections facing rear of bin.
b) If using existing bin, place supplied gasket 2.5" (64mm)
from front of bin. Position icemaker with utility connections
facing rear of bin.
Routing and mounting ice transport tubes
1. Remove icemaker top panel and louvered side panel.
2. Remove transport tubes. Route tubes from inside bin, through
gasket and connect to evaporator port (Fig 2).
3. Tighten hose clamp to secure tubes to ports.
Routing and mounting bin thermostat
1. Insert thermostat through clamps on transport tube as shown
(Fig. 3).
Plumb for water and drain
1. Connect drain to 3/4" MPT fitting in rear of unit.
2. Connect potable water supply (plastic or copper tubing) to
3/8" push-in connector in rear of unit.
Fig. 1
1
Fig. 2
Fig. 3
Bin
thermostat -
capillary tube
6
2
Ice
ICE TRANSPORT TUBE
transport
tubes
Ice
transport
tubes
Bin top

Advertisement

Table of Contents
loading

Table of Contents