Checking The Functioning Of The Varistors - SMA SUNNY BOY 2000HF Installation Manual

Hide thumbs Also See for SUNNY BOY 2000HF:
Table of Contents

Advertisement

Failure Search
11.2 Checking the Functioning of the Varistors
If the inverter displays the event number "74", then one of the varistors is probably defective.
Varistors are wear parts. Their functional efficiency diminishes with age or following repeated
responses as a result of overvoltages It is therefore possible that one of the thermally monitored
varistors has lost its protective function.
Position of Varistors
You can determine the position of the varistors using the illustration below.
The varistors are bent upon delivery.
Observe the following assignment of the
terminals.
• Terminal A: outer terminal (varistor
connection with loop [crimp]).
• Terminal B: middle terminal.
• Terminal C: outer terminal (varistor
connection without loop [crimp]).
You can check the functionality of the varistors in the following manner:
1. Disconnect the inverter on the AC and DC sides as described in section 8 "Disconnect the
Inverter from Voltage Sources" (page 60).
DANGER!
Danger to life due to high voltages in the inverter.
The capacitors require 5 minutes to discharge.
• Wait 5 minutes before opening the housing cover, in order to allow time for the
capacitors to discharge.
2. Loosen the screws of the enclosure lid.
3. Remove the enclosure lid.
76
SB20_25_30HF-IEN102911
SMA Solar Technology AG
Installation Guide

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2000hf

Table of Contents