3Com SuperStack II User Manual page 69

Bridge/router
Hide thumbs Also See for SuperStack II:
Table of Contents

Advertisement

4 Reinstall the screw on the standoff.
5 Reinstall the cover and the cover screws.
CAUTION: The DIP switches should all be in the down position. The
DIP switches are accessible through an opening on the side of the
chassis.
DIP switches should all
be in the down position
6 If the bridge/router was mounted with brackets, reinstall the brackets
and remount it.
7 Reconnect the power cord and all cables.
Installing a New Module (Model 5xx)
Install screws
69

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SuperStack II and is the answer not in the manual?

This manual is also suitable for:

Netbuilder siSuperstack ii netbuilder si

Table of Contents