Potterton EC three 125 Installation, Operation And Maintenance Manual page 88

Floor standing condensing gas boilers 125 to 300kw
Table of Contents

Advertisement

Programming
Floor curing function
(850, 1150, 1450)
Floor curing setp manually
(851, 1151, 1451)
Floor curing setp current
(855, 1155, 1455)
Screed day actual
(856, 1156, 1456)
88
The floor curing function serves controlled drying out of screed floors
- Off: the function is switched off.
- Functional heating (Fh): Part 1 of the temperature profile will be run through
automatically.
- Curing heating (Ch): Part 2 of the temperature profile will be run through auto-
matically.
- Functional heating and curing heating: The whole temperature profile will be
run through automatically.
- Manually: Control to the floor curing setpoint manually.
Fig. 20: Temperature profile of the floor -curing function
x
Fh
X
Starting day
Fh Functional heating
Ch Curing heating
Important! The respective regulations and standards of the screed manufacturer
have to be observed.
A correct function is only possible with a correctly installed plant (hydraulic, elec-
trical systems and settings).
Deviations can only lead to damage of the screed.
The floor curing function can be stopped prematurely by setting 0=OFF.
Setting of temperature, up to which manual control is carried out at activated
floor curing function (see prog. no. 850).
Display of the current floor curing setpoint.
Display of the current day of the floor curing function.
Condensing gas boiler Eurocondense three125-300 kW
Ch
Fh+Ch
[day]
7308536-02 06.13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents