Potterton EC three 125 Installation, Operation And Maintenance Manual page 77

Floor standing condensing gas boilers 125 to 300kw
Table of Contents

Advertisement

Function
Fan output/speed slope
Fan output/speed Y-section
Info Option
The display of the information values depends on the operation status!
Fault message
Servicing message
Setpoint manual control
Floor curing setp current
Floor curing day current
Room temperature
Room temperature min
Room temperature max
Cascade flow temp
Controller stop setpoint
Boiler temp
Outside temp
Outside temp min
Outside temp max
DHW temp 1
DHW consumption temp
Collector temp 1
24-hour yield solar energy
Solid fuel boiler temp
Buffer temp 1
Swimming pool temp
State heating circuit 1
State heating circuit 2
State heating circuit 3
State DHW
State boiler
State solar
State solid fuel boiler
State buffer storage tank
State swimming pool
Year
Date
7308536-02 06.13
Condensing gas boiler Eurocondense three125-300 kW
Programming
Prog.
Standard value
1)
Level
no.
9626
F
EC three 125: 37,1
EC three 170: 27,6
EC three 215: 26,4
EC three 260: 20,1
EC three 300: 19,9
9627
F
EC three 125: 501,1
EC three 170: 517,2
EC three 215: 464,4
EC three 260: 488,0
EC three 300: 431,7
77

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents