Unit 2: Setup - Bunn JDF Silver Series Technical Training Manual

Dispensers
Table of Contents

Advertisement

U
2 s
nit
Unit Objectives
Given a realistic scenario depicting a new site install, the learner will be able to install and setup the dispens-
er for customer turnover without error.
Given an installed machine, all the necessary tools and safety equipment, the learner will be able to
set the machine up for initial operation.
The learner will be able to load the product.
The learner will be able to prime the pumps.
The learner will be able to perform a water flow test and adjustment.
The learner will be able to perform a total dispense test.
The learner will be able to perform a pump speed adjustment.
The learner will be able to set the portion control option.
etup

Advertisement

Table of Contents
loading

Table of Contents