Hardware Installation - Fujitsu Primergy CX250 S2 Operating Manual

Server node
Hide thumbs Also See for Primergy CX250 S2:
Table of Contents

Advertisement

5

Hardware installation

V
CAUTION!
Follow the safety instructions in the chapter
on page
Do not expose the server node to extreme environmental conditions
(see
"Ambient conditions" on page
dust, humidity and heat.
Make sure that the server node is acclimatized for the time indicated
in this table before putting it into operation.
Temperature difference (°C)
Table 1: Acclimatization time
In the
table "Acclimatization
to the difference between the operating environment temperature and
the temperature to which the server node was exposed previously
(outside, transport or storage temperature).
CX250 S2
21.
5
10
15
20
25
30
Operating Manual
"Important information"
16). Protect the server node from
Minimum acclimatization time
time", the temperature difference refers
(hours)
3
5
7
8
9
10
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents