Installation Steps, Overview - Fujitsu Primergy CX250 S2 Operating Manual

Server node
Hide thumbs Also See for Primergy CX250 S2:
Table of Contents

Advertisement

3

Installation steps, overview

This chapter contains an overview of the steps necessary to install your server
node. Links take you to sections where you can find more detailed information
about the respective steps:
Ê First of all, carefully read the safety instructions in
page
21.
Ê Transport the server node to the place where you want to set it up.
Ê Unpack the system, check the contents of the package for visible transport
damage and check whether the items delivered match the details on the
delivery note (see section
Ê Make sure that you have all necessary manuals (see
overview" on page
Ê Components that have been ordered additionally may be delivered loose
with the server node. For mounting refer to the original component
documentation.
Ê Wire the server node. Follow the instructions in sections
devices to the server node" on page 37
connecting/disconnecting cables" on page
Ê Familiarize yourself with the controls and indicators on the front and rear of
the server node (see section
CX250 S2
"Unpacking the server node" on page
9); print out the PDF files if required.
"Controls and indicators" on page
Operating Manual
"Important information" on
"Documentation
"Connecting
and
"Notes on
39.
34).
41).
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents