Bock Water heaters OT300-A Installation And Operation Instruction Manual page 16

High efficiency commercial gas water heater
Table of Contents

Advertisement

SECTION IV: INSTALLATION (cont.)
VENT & COMBUSTION AIR INTAKE (cont.)
Horizontal Venting, Direct Vent 2-pipe termination
This water heater may be vented horizontally (through a sidewall) with a two-pipe
termination. Two holes through an exterior wall are required for the vent and
combustion air intake pipes. Minimum clearances between the terminals must be met as
specified in Figure 8. All clearances must comply with local codes or the latest edition of
NFPA 54/ANSI Z223.1 or CSA B149. See Figure 7 and Table 8 for terminal clearances.
Page 16
Figure 7: Terminal Clearances

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ot500-aOt400-aOt500Ot300Ot400

Table of Contents