SPX Power Xpress Installation Manual page 18

Bollard charge station
Table of Contents

Advertisement

21. Apply decal to the front of the EVSE cover.
22. Continue lowering the EVSE until the front
edge of the EVSE bottom cover rests on the
ledge in the bollard front opening.
A. EVSE bottom cover
B. Ledge in bollard front opening
Figure 24. EVSE Lowered into Position
WARNING: The lower edge of the EVSE
bottom cover must rest on the ledge
of the bollard. Failure to position the
EVSE correctly in the opening will cause
damage to the EVSE when the locating
set screw is tightened.
WARNING: Never use any other size set
screw to secure the EVSE in place. If
the set screw is too long, it will prevent
installation of the upper cover.
18
Power Xpress™ Bollard Charge Station
23. Push any excess conduit down into the bollard.
A
B
Figure 25. Excess Conduit Pushed into Bollard
24. Install the locating set screw to 50 ± 5 in-lb
Figure 26. Tightening the Locating Set Screw
Installation Guide
A loop will extend above the bollard and fit in
the top cover.
(5.5 ± 0.55 Nm).
EL-50600-17 Rev. A

Advertisement

Table of Contents
loading

Table of Contents