SPX Power Xpress Installation Manual page 16

Bollard charge station
Table of Contents

Advertisement

12. Position the conduit on the left side of the
bollard (opposite the open metal slot side).
B
A. Tapered EVSE guide bracket
B. 1/2-in. liquid-tight flexible conduit
Figure 17. Conduit Positioned on Left
13. Gently guide the EVSE body down through the
bollard until it rests on the top of the tapered
guide bracket.
C
A. EVSE
B. Tapered EVSE guide bracket
C. 1/2-in. liquid-tight flexible conduit
Figure 18. EVSE Resting on Bracket
16
Power Xpress™ Bollard Charge Station
14. Mark 1/2-in. liquid-tight flexible conduit for
length based on the required radius bend to
attach to the top of the EVSE.
A
A
A. Location to cut conduit
B. Precut hole in top of EVSE
C. 1/2-in. liquid-tight flexible conduit
Figure 19. Location to Cut Conduit
15. Cut 1/2-in. liquid-tight flexible conduit to
length. Do not cut wires.
16. Install approved, liquid-tight fittings to attach
1/2-in. liquid-tight flexible conduit to top of
EVSE.
A
B
A. 1/2-in. liquid-tight flexible conduit
B. Liquid-tight fitting
Figure 20. Fittings Installed
Installation Guide
B
A
B
EL-50600-17 Rev. A
C

Advertisement

Table of Contents
loading

Table of Contents