SPX Power Xpress Installation Manual page 15

Bollard charge station
Table of Contents

Advertisement

Power Xpress™ Bollard Charge Station
Installation Guide
5.
Place the bollard on its side.
6.
Gently guide the conduit through the bottom
of the bollard and position the bollard over the
bolts and onto the base.
A. 1/2-in. liquid-tight flexible conduit
B. Liquid-tight fitting
C. Adapter
D. Bollard base plate
Figure 14. Guide Conduit into Bollard
7.
Use a level on two sides (90° apart) of the
bollard to check whether the bollard is standing
straight.
8.
If the bollard is not plum and level, remove the
bollard and place washers on the lag bolts as
needed to level the bollard.
9.
Repeat Steps 7 and 8 until the bollard is level.
NOTE: Alternately, double-nut leveling installation
is acceptable.
EL-50600-17 Rev. A
A
B
D
C
10. Install a washer, lock washer, and nut on each
bolt.
E
D
A. Bollard
B. Nut
C. Lock washer
D. Flat washer
E. Lag Bolt
Figure 15. Install Washers and Nuts
11. Tighten the nuts evenly around the bollard.
Any gap between the bollard base and the
mounting surface may be filled with caulk
suitable for the installation environment.
A
B
C
15

Advertisement

Table of Contents
loading

Table of Contents