SPX Power Xpress Installation Manual page 14

Bollard charge station
Table of Contents

Advertisement

CAUTION: Read all instructions before installing
the EVSE.
WARNING: Main service power must be
off and disconnected before attempting
to install the EVSE.
WARNING: The bollard weighs 20 lb per
foot, and the bottom end is significantly
heavier than the top end. Take proper
precautions and use safe lifting practices
when lifting the bollard.
CAUTION: All adapter and connection fittings
must be classified as liquid-tight. The following
types of flexible conduit are recommended:
LFMC (liquid-tight flexible metal conduit),
LFNC-B (liquid-tight flexible nonmetal conduit),
or
LFNC-A
(liquid-tight
conduit).
1.
Place the bollard where it is to be installed and
drill holes.
2.
Install the 3/4 in. anchor bolts in accordance
with industry standards for the type of
mounting being performed.
A
B
A. Conduit stand pipe
B. Marked locations for anchor bolts
Figure 12. Drill Holes
14
Power Xpress™ Bollard Charge Station
NOTE: Depending on the type and size of the con-
3.
4.
NOTE: Consult national and local codes for ap-
fexible
nonmetal
Installation Guide
duit stand pipe, a variety of adapters may
be used to convert the stand pipe to 1/2-in.
liquid-tight flexible conduit.
Slide the wires through the required adapters
and the 1/2-in. liquid-tight flexible conduit.
Install 1/2-in. liquid-tight flexible conduit to the
conduit stand pipe.
proved, liquid-tight flexible conduit.
A. 1/2-in. liquid-tight flexible conduit
B. Liquid-tight fitting
C. Threaded adapter
D. Conduit stand pipe
Figure 13. Stand Pipe Conduit Connection
A
B
C
D
EL-50600-17 Rev. A

Advertisement

Table of Contents
loading

Table of Contents