Fujitsu Primergy BX900 S2 Operating Manual page 56

Blade server
Hide thumbs Also See for Primergy BX900 S2:
Table of Contents

Advertisement

Hardware installation
Ê Fasten the carrier rail at the lower end of the support bracket using three
centering screws (2).
Ê Position the carrier rail in the front left support upright.
Ê Fasten the carrier rail to the front support upright (3) using three M5 screws
including plugwashers.
Ê Repeat the operation for the right carrier rail. This rail does not require a
support bracket.
Figure 8: Position of the cage nuts
Ê Fit the cage nuts for securing the system unit in the corresponding catches
on the right and left support uprights.
56
27
13
Operating Manual
27
25
20
15
13
10
5
1
BX900S2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents