Lubricating Connecting Rod Bearing; Cleaning Pump - WACKER Group PDT 2 Repair Manual

Table of Contents

Advertisement

Maintenance

4.11 Lubricating Connecting Rod Bearing

See Graphic: wc_gr003451
j

4.12 Cleaning Pump

See Graphic: wc_gr003451
4.12.1 Pump clean water through pump for a few minutes after each use to
4.12.2 Remove dirt from between engine cooling fins to prevent them from
4.12.3 Remove front cover (k) and clean dirt and grease build-up from
wc_tx000593gb.fm
Grease connecting rod bearing once a week or every 25 hours of
operation.
Use a hand operated grease gun. Add grease through grease fitting
located behind access hole (j) provided on front cover.
When pumping heavy sludges or water containing large amounts of
dirt and solids, clean the pump often. If allowed to sit in the pump and
dry, these materials will harden and could damage the valves or
diaphragm inside the pump the next time it is used.
When cleaning pump:
flush dirt from inside pump and hoses.
clogging up. This will prevent engine from overheating.
connecting rod and inside of front pump cover.
k
30
PD
wc_gr003451

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pdi 2Pdi 3Pdt 3

Table of Contents