Operation; Accessories - WACKER Group PDT 2 Repair Manual

Table of Contents

Advertisement

PD 2A/3A
3.9

Operation

WARNING

3.10 Accessories

wc_tx000592gb.fm
Run engine at full speed while operating pump.
Pump should begin pumping water within a minute depending on
length of suction hose and height of pump above water. Longer hoses
will require more time.
If pump does not prime, check for loose fittings or air leak in suction
hose. Make sure strainer in water is not blocked.
DO NOT pump flammable fluids, fuels, corrosive chemicals or fluids
containing toxic substances.
dangerous health and environmental hazards.
authorities for assistance.
WACKER offers a complete line of fittings, hoses, and clamps to
properly connect the pump to match various job conditions.
These fluids can create potentially
19
Operation
Contact local

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pdi 2Pdi 3Pdt 3

Table of Contents