Chapter 3 Connecting The Switch; Switch To End Node - D-Link DGS-3000-10TC Hardware Installation Manual

Dgs-3000 series layer 2 managed gigabit ethernet switch
Table of Contents

Advertisement

DGS-3000 Series Layer 2 Managed Gigabit Ethernet Switch Hardware Installation Guide
Chapter 3

Switch to End Node

Switch to Switch
Connecting To Network Backbone or Server
NOTE: All high-performance N-Way Ethernet ports can support both MDI-II and MDI-X connections.
Switch to End Node
End nodes include PCs outfitted with a 10, 100 or 1000 Mbps RJ-45 Ethernet Network Interface Card (NIC) and
routers. An end node connects to the Switch via a twisted-pair UTP/STP cable. Connect the end node to any of the
1000BASE-T ports of the Switch. The Link/Act LEDs for each Ethernet port will light green or amber when the link is
valid. A blinking LED indicates packet activity on that port.
Connecting the Switch
Figure 3-1 Connecting the Switch to an end node
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dgs-3000-24tcDgs-3000-26tc

Table of Contents