Maintenance
4.9.6
Every 100 hours service
Maintenance for every 50 hours service should be carried out at
the same time.
Lubricate rear axle pivot pin
(3 places)
1. Using a grease pump, pump in grease through the grease
fittings marked by the arrows.
2. After greasing, wipe off any old grease that was pushed out.
Check oil level in hydraulic tank, add oil
WARNING
The parts and oil are at high temperature after the engine is
stopped, and may cause burns. Wait for the temperature to
go down before starting the work.
When removing the oil filler cap, turn it slowly to release the
internal pressure, then remove it.
1. Lower the bucket horizontally to the ground and stop the
engine. Wait for 5 minutes, then check sight gauge (G). The
oil level should be between the H and L marks.
NOTE
Do not add oil above the H line. This will damage the hydraulic
circuit or cause the oil to spurt out. If oil has been added to
above the H level, stop the engine and wait for the hydraulic oil
to cool down, then drain the excess oil from drain plug.
2. If level is below the L mark, add oil through filler (F) at top of
the hydraulic tank.
WA500-6H – VEAM430100
4.9 Service procedure
Every 100 hours service
GK050216
G
GK050217
F
GK050214
4-53