Yamaha WaveRunner XL1200Ltd Service Manual page 93

Marine water vehicles
Table of Contents

Advertisement

POWR
ENGINE UNIT
SERVICE POINTS
Shim removal
1. Remove:
Shims
NOTE:
To ease reassembly and coupling align-
ment, remove the shims and organize them
in their respective groups (e.g., front right,
rear left) prior to removing the mounting
bolts.
Engine mount inspection
1. Inspect:
Engine mounts
Cracks/damage → Replace.
Coupling clearance inspection
1. Measure:
Clearance a
Clearance b
(with a straightedge and thickness
gauge)
Out of specification → Adjust with the
shims.
NOTE:
Before measuring the clearance, remove
the rubber damper.
Clearance a:
0 ~ 1.0 mm (0 ~ 0.039 in)
Clearance b:
2 ~ 4 mm (0.079 ~ 0.157 in)
5-14
E

Advertisement

Table of Contents
loading

Table of Contents