Stage 4 - Water Supply Installation - Neptronic SKG3 Series Installation Instructions Manual

Gas fired humidifier
Table of Contents

Advertisement

SKG3 Steam Humidifier
Stage 4 – Water Supply Installation
!
Water supply installation should conform to local codes and regulations.
Any installation work must be carried out by suitably qualified personnel.
Water inlet
Neptronic® SKG3 Humidifier is designed to be used with mains, reverse
Specifications
osmosis, de-ionized and de-mineralized water.
Maximum water supply pressure: 10 to 70psig (70 to 480kPa)
Minimum water temperature: 49˚F (+4˚C)
Maximum water temperature: 104˚F (+40˚C)
Water inlet
Model
Connection size
1/2'' NPT
SKG3-110 to 810
Male
Water supply line
To facilitate servicing, a shut off valve (not supplied) should be installed in the
Installation
water line, within 40'' (1m) of the humidifier.
Feed Water supply line
¼ turn Shut off Valve
Gasket
Gasket
Flexible Hose
SKG3
Water Inlet connection
Water supply connection - Fig. 31
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents