Installation Overview - Neptronic SKG3 Series Installation Instructions Manual

Gas fired humidifier
Table of Contents

Advertisement

SKG3 Steam Humidifier

Installation Overview

All installation work must comply with local regulations.
!
All work related to the installation of the SKG3 Steam Humidifier MUST only be
performed by skilled and qualified technical personnel (e.g. qualified gas installer,
fitters, electricians, plumbers or technicians with appropriate training).
The customer is responsible for ensuring their suitability.
For the installation of the SKG3 Steam Humidifier and associated components there
should be no special tooling requirements above that of a fitter's toolkit.
Stage1: Unit Positioning and Mounting
Installation
method
Stage 2: Steam Distribution Installation
statement
Stage 3: Gas Supply Connection
Stage 4: Water Supply Installation
Stage 5: Water Drain Connection
Stage 6: Combustion Air Installation
Stage 7: Flue Gas Venting Connection
Stage 8: Electrical Supply and Installation
Stage 9: Electrical Control Connections
Stage 2
air
or
air
Stage 7
Stage 6
air
Stage 8
air
air
Stage 9
air
Stage 3
To drain
Stage 1
Stage 5
Stage 4
Installation overview - Fig. 11
10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents