Grounding; Connection Of Communication - Samil Power SolarRiver 3400TL-D Product Manual

Solarriver-d pv grid-tied inverter
Hide thumbs Also See for SolarRiver 3400TL-D:
Table of Contents

Advertisement

Installation
Step4: Screw down the threaded sleeve.
Step5: Screw down the pressure screw.
Step6: Connect AC connector to inverter.

5.7.5 Grounding

In the system, all non-current-carrying metal parts (such as shell of combiner, distribution and inverter)
should be connected to the earth.
PV String
PV module frame

5.7.6 Connection of communication

Please refer to part 8.2.2
20
Socket element with threaded sleeve
Threaded sleeve
Neither positive nor negative could grounding because of no transformer, or it
wil break down.
Figure 16 grounding of system
Pressure screw
Pressure screw
Inverter
AC Switchboard
L
N
EARTH
PE
LINK

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents