Flue Gas Analysis - Worcester GREENSTAR Ri Installation And Servicing Instructions

Wall hung rsf gas fired condensing boiler
Hide thumbs Also See for GREENSTAR Ri:
Table of Contents

Advertisement

If the boiler fails the fan pressure test then before
adjusting the air/gas ratio, try the following:
B Check the syphon is not blocked.
1. Remove the screws securing the sump cover.
2. Remove the sump cover.
3. Clean the sump with a suitable brush.
B Check the exhaust path and flue for restriction.
B Re-check the Fan Pressure readings
Fig. 59 Sump access
6 720 644 744a (2010/10)
3.
2.
1.
1.
6720644744-40.1Wo
6.5

FLUE GAS ANALYSIS

COMBUSTION TEST:
Ensure that the gas inlet pressure has been
checked and is satisfactory,
refer to section 5.5.1
B Connect the flue gas analyser to the flue gas sampling
point as shown in the figure below.
B Run the boiler at maximum output for at least 10
minutes.
B Check the CO/CO
readings against the information
2
in table 20 CO/CO
settings on page 44.
2
Fig. 60
If the boiler fails the combustion test, check:
1. Air intake for restriction
2. Diaphragm in the fan, for correct operation
3. Cleanliness of the heat cell, plus blockages in the
condensate disposal.
SERVICE AND SPARES
43

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents