Worcester GREENSTAR Ri Installation And Servicing Instructions page 40

Wall hung rsf gas fired condensing boiler
Hide thumbs Also See for GREENSTAR Ri:
Table of Contents

Advertisement

SERVICE AND SPARES
LOWERING THE BOILER CONTROLS TO THE SERVICE
POSITION:
1. Remove two screws securing the control.
2. Pull the control forward.
3. Lower the control to align the slots at the top of the
control with the lugs on the boiler framework.
4. Hang control on two lugs on boiler framework.
2.
1.
1.
3.
4.
4.
6720644744-36.1Wo
Fig. 53 Control panel into service position
40
6 720 644 744a (2010/10)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents