SMA SUNNY MINI CENTRAL 6000TL Installation Manual
SMA SUNNY MINI CENTRAL 6000TL Installation Manual

SMA SUNNY MINI CENTRAL 6000TL Installation Manual

Pv inverter
Hide thumbs Also See for SUNNY MINI CENTRAL 6000TL:
Table of Contents

Advertisement

PV Inverter
SUNNY MINI CENTRAL 6000TL / 7000TL / 8000TL
Installation Guide
SMC6-8TL-IEN101040 | IME-SMCTL_60_70_80 | Version 4.0
EN

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SUNNY MINI CENTRAL 6000TL and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for SMA SUNNY MINI CENTRAL 6000TL

  • Page 1 PV Inverter SUNNY MINI CENTRAL 6000TL / 7000TL / 8000TL Installation Guide SMC6-8TL-IEN101040 | IME-SMCTL_60_70_80 | Version 4.0...
  • Page 3: Table Of Contents

    SMA Solar Technology AG Table of Contents Table of Contents Notes on this Manual......7 Scope of Validity.
  • Page 4 Connecting the PV Generator (DC) ....... 34 Connection of the SMA Power Balancer ....37 5.5.1...
  • Page 5 Technical Data ........74 11.1 Sunny Mini Central 6000TL ......74 11.2 Sunny Mini Central 7000TL .
  • Page 6 Table of Contents SMA Solar Technology AG SMC6-8TL-IEN101040 Installation Guide...
  • Page 7: Notes On This Manual

    You will find further information on special topics such as designing a line circuit breaker or the description of the operating parameters in the download area at www.SMA.de/en. Refer to the user manual for detailed information on operating the inverter.
  • Page 8: Symbols Used

    Notes on this Manual SMA Solar Technology AG 1.4 Symbols Used The following types of safety precautions and general information are used in this manual: DANGER! "DANGER" indicates a hazardous situation which, if not avoided, will result in death or serious injury.
  • Page 9: Safety

    For further information on this subject, see the technical information "Capacitive Discharge Currents" in the download area at www.SMA.de/en. Installation Guide SMC6-8TL-IEN101040...
  • Page 10 Parameters” (page 45)). To change grid-relevant parameters, you need a personal access code - the so-called SMA Grid Guard Code. The application form for the personal access code is located in the download area at www.SMA.de/en, in the "Certificate" category for each inverter.
  • Page 11: Safety Precautions

    • Securely attach the Electronic Solar Switch again. Grounding the PV Generator Comply with the local requirements for grounding the modules and the PV generator. SMA Solar Technology AG recommends connecting the generator frame and other electricity- conducting surfaces such that there is continuous conduction and to connect them to the ground in order to reach maximum protection for property and persons.
  • Page 12: Explanation Of Symbols

    Safety SMA Solar Technology AG 2.3 Explanation of Symbols This chapter contains an explanation of all symbols found on the inverter and type label. 2.3.1 Symbols on the Inverter Symbol Explanation Operation display. Indicates the operation condition of the inverter. Ground fault or varistor defective.
  • Page 13: Symbols On The Type Label

    SMA Solar Technology AG Safety 2.3.2 Symbols on the Type Label Symbol Explanation Beware of dangerous electrical voltage. The inverter operates at high voltages. All work on the inverter must be carried out by qualified personnel only. Beware of hot surface.
  • Page 14: Unpacking

    Cylinder head screws (M6x16): 1 x for lid (replacement), 1 x for ground connection cable terminal Jumper (1x for fan test 1x for the cabling of the SMA Power Balancer) Cylinder head screws (M6x8) for securing the inverter to the wall mounting...
  • Page 15: Identifying The Inverter

    SMA Solar Technology AG Unpacking Object Quantity Description Set of documents with explanations and certificates Supplementary sheet with inverter factory settings 3.2 Identifying the Inverter You can identify the inverter by the type label. The type label is on the right side of the enclosure.
  • Page 16: Mounting

    Mounting SMA Solar Technology AG 4 Mounting 4.1 Safety DANGER! Danger to life due to fire or explosion! Despite careful construction, electrical devices can cause fires. • Do not mount the inverter on flammable construction materials. • Do not mount the inverter in areas where highly flammable materials are stored.
  • Page 17 SMA Solar Technology AG Mounting • Never install the device with a forward tilt. • Do not install horizontally. • Install at eye level to allow operating modes to be read at all times. • The ambient temperature should be below 40 °C to ensure optimal operation.
  • Page 18: Mounting The Inverter With Wall Mounting Bracket

    Mounting SMA Solar Technology AG 4.3 Mounting the Inverter with Wall Mounting Bracket 1. Mark the position of the drill holes using the wall mounting bracket and drill the holes. Use at least 2 of the 6 holes, with one hole on the right and one on the left.
  • Page 19 SMA Solar Technology AG Mounting CAUTION! Risk of injury due to the heavy weight of the inverter. The inverter weights approx. 33 kg. • Attach the wall mounting bracket with the corresponding mounting material (depending on the surface). • Use the side handles (above and below) or a steel rod (maximum diameter of 30 mm) for transport and mounting.
  • Page 20 The air grills prevent dirt and insects from entering the device and, if necessary, can be reordered from SMA Solar Technology AG (see section 13 ”Contact” (page 85)) Optional Theft Protection To protect the inverter against theft, the rear panel can be secured to the wall at the bottom using 2 single-use bolts.
  • Page 21: Electrical Connection

    Socket for connecting the Electronic Solar Switch (ESS) DC load disconnection unit Cable gland for optional communication via RS485 (PG16) Cable gland for grid connection (AC) (12 mm … 25 mm) Cable glands for SMA Power Balancer Installation Guide SMC6-8TL-IEN101040...
  • Page 22: Interior View

    The following illustration shows the various components and connection areas of the open inverter. Object Description Connection area and sockets for communication (page 44) Display Jumper for testing the fans (page 58) LEDs for displaying the operating modes (page 46) Jumper for SMA Power Balancer (page 37) SMC6-8TL-IEN101040 Installation Guide...
  • Page 23: Connection To The Public Grid (Ac)

    Object Description Connections terminals for SMA Power Balancer (page 37) Flat connector for grounding the cable shield when connecting the SMA Power Balancer (page37) Connection terminals for mains cable (AC) (page 23) Cable glands for the SMA Power Balancer (page 37)
  • Page 24: Cable Requirements

    The maximum permissible rating is located in section 11 ”Technical Data” (page 74). Detailed information and examples for the rating of a line circuit breaker can be found in the Technical Information "Line Circuit Breaker" in the SMA Solar Technology AG download area at www.SMA.de/en. DANGER! Danger to life due to fire.
  • Page 25 SMA Solar Technology AG Electrical Connection DANGER! Danger to life due to fire. When a generator (inverter) and a consumer are connected to the same line circuit breaker, the protective function of the line circuit breaker is no longer guaranteed. The current from the inverter and the grid can accumulate to overcurrent, which is not detected by the line circuit breaker.
  • Page 26: Connecting The Inverter To The Public Grid (Ac)

    The exact operating range of the inverter is specified in the operating parameters. The corresponding document is available in the download area at www.SMA.de/en. 2. Switch off the line circuit breaker and secure it to prevent it from being reactivated.
  • Page 27 SMA Solar Technology AG Electrical Connection 9. Secure the lid with all screws and the corresponding lock washers. Tighten the screws with 6 Nm torque in the order shown on the right hand side. The toothing of the tooth lock washers must face toward the lid.
  • Page 28: Additional Grounding Of The Enclosure

    Electrical Connection SMA Solar Technology AG 5.2.3 Additional Grounding of the Enclosure If a second protective conductor connection is required in the country of installation, you can also ground the inverter using a second protective conductor on the connection terminal on the enclosure.
  • Page 29: Setting The Display Language

    SMA Solar Technology AG Electrical Connection 5.3 Setting the Display Language You can set the language of the display using the switches on the underside of the display assembly inside the inverter. Procedure 1. Open the inverter as described in section 7.2 ”Opening the Inverter” (page 52).
  • Page 30: Connection Of The Pv Generator (Dc)

    Electrical Connection SMA Solar Technology AG 5.4 Connection of the PV Generator (DC) 5.4.1 Conditions for the DC Connection Use of Adaptors Adaptors (branch connectors) are not to be visible or freely accessible in the immediate surroundings of the inverter. • The DC current flow may not be interrupted via adaptors.
  • Page 31: Assembling The Dc Plug Connectors

    SMA Solar Technology AG Electrical Connection 5.4.2 Assembling the DC Plug Connectors In order to connect to the inverter, all connecting cables of the PV modules must be equipped with the DC plug connectors provided. To assemble the DC plug connectors, proceed as detailed below. Ensure the plug connectors have the correct polarity.
  • Page 32 Electrical Connection SMA Solar Technology AG Result Action ☑ If the conductor is not visible in the hollow • Loosen the clamping clip with the help of a cavity of the clamp, the cable is not in the screwdriver. correct position.
  • Page 33: Opening The Dc Plug Connectors

    SMA Solar Technology AG Electrical Connection 5.4.3 Opening the DC Plug Connectors 1. Screw the threaded joint off. 2. To release the plug connector, slot a screw driver into the side catch mechanism and lever out. 3. Carefully pull the DC plug connector apart.
  • Page 34: Connecting The Pv Generator (Dc)

    Electrical Connection SMA Solar Technology AG 5.4.4 Connecting the PV Generator (DC) DANGER! Danger to life due to high voltages in the inverter. • Before connecting the PV generator, ensure that the line circuit breaker is switched off. NOTICE! Excessive voltages can destroy the measuring device.
  • Page 35 SMA Solar Technology AG Electrical Connection 4. Check the strings for ground faults, as described in section 9.3.1 ”Checking the PV Generator for a Ground Fault” (page 68). 5. Check the DC plug connector for correct polarity and connect it. To release the plug connectors see section 7.2 ”Opening the Inverter” (page 52).
  • Page 36 Electrical Connection SMA Solar Technology AG NOTICE! Manipulating the connector in the handle can damage the Electronic Solar Switch. The connector inside the handle must remain movable in order to ensure proper contact. Tightening the screw voids all warranty claims and creates a fire risk.
  • Page 37: Connection Of The Sma Power Balancer

    Electrical Connection 5.5 Connection of the SMA Power Balancer The Sunny Mini Central is equipped with the SMA Power Balancer as standard. This enables a circuit connection of 3 Sunny Mini Central to a three-phase feed-in system. Each of the 3 Sunny Mini Central devices in a group must be connected to a different phase conductor...
  • Page 38 Electrical Connection SMA Solar Technology AG Configuration Options There are 4 different configuration options for the "PowerBalancer" parameter. Local connection requirements Select the respective setting and always observe the local connection requirements and provisions of your utility operator. • FaultGuard This operating mode enables the implementation of three-phase grid voltage monitoring that also reacts to device failures.
  • Page 39 SMA Solar Technology AG Electrical Connection • PhaseGuard This operating mode enables the implementation of three-phase grid voltage monitoring. – If one of the three inverters indicates a grid voltage fault and stops feeding in, the other two inverters also disconnect from the grid automatically.
  • Page 40 Unbalanced load limitation for SMC 6000TL-IT / 7000TL-IT / 8000TL-IT (applies exclusively to Italy) For the Sunny Mini Central 6000TL-IT / 7000TL-IT / 8000TL-IT, the unbalanced load is limited to 6 kVA. – If one of the three inverters indicates a grid voltage fault or device fault and stops feeding in, the other two inverters automatically limit their power to 5 kVA over a 10 minute average.
  • Page 41: Cabling

    SMA Solar Technology AG Electrical Connection 5.5.2 Cabling Cable Requirements For cabling the SMA Power Balancer, use a "LiYCY" cable, structured as shown here: • Indoor: LiYCY 2 x 2 x 0.25 • Outdoor: Li-2YCYv 2 x 2 x 0.25 Position...
  • Page 42 Use one of the two cable glands (F) on the right hand side. DANGER! Danger to life through high voltage if there is a fault with the SMA Power Balancer cable. • Sheath the positive and negative cable conductors in each inverter using the enclosed silicone tube.
  • Page 43 Connection with one Sunny Mini Central 9000TL, 10000TL or 11000TL In order to be able to connect the SMA Power Balancer with a Sunny Mini Central 9000TL, 10000TL or 11000TL, the Sunny Mini Central 6000TL, 7000TL oder 8000TL must be equipped with a special plug.
  • Page 44: Testing The Functioning

    SMA Solar Technology AG 5.5.3 Testing the Functioning To test whether the SMA Power Balancer operates correctly, proceed as follows. 1. Select the "PhaseGuard" setting of the "PowerBalancer" parameter for all three inverters. 2. Check whether all inverters in the group are feeding the grid normally.
  • Page 45: Setting The Grid And Country Parameters

    5.7 Setting the Grid and Country Parameters Changing Grid-Relevant and Country Parameters To change grid-relevant parameters, you need a personal access code - the so-called SMA Grid Guard Code. The application form for the personal access code is located in the download area at www.SMA.de/en, in the "Certificate"...
  • Page 46: Commissioning

    Commissioning SMA Solar Technology AG 6 Commissioning 6.1 Commissioning the Inverter Self test in accordance with DK 5640, Ed. 2.2 for initial commissioning (applies to Italy only) The Italian DK 5940 standard requires that an inverter can first operate on the public grid when the disconnection times for overvoltage, undervoltage, minimum frequency and maximum frequency have been checked.
  • Page 47: Self-Test In Accordance With Dk 5940, Ed

    SMA Solar Technology AG Commissioning 6.2 Self-Test in accordance with DK 5940, Ed. 2.2 (applies to Italy only) 6.2.1 Starting the Self-Test by Tapping You can start the self-test by tapping on the enclosure lid. Prerequisite here is that the country configuration of the inverter has been set to Italy (IT/DK5940) or "trimmed". Proceed as follows for checking the disconnection times: 1.
  • Page 48 Commissioning SMA Solar Technology AG Overvoltage Test The inverter begins with the overvoltage test. During the test sequence, the voltage limit applied is shown in the display of the inverter. The voltage limit is reduced successively until the shut- down threshold is achieved and the inverter disconnects from the grid.
  • Page 49 SMA Solar Technology AG Commissioning Undervoltage Test After the overvoltage test, the inverter performs the undervoltage test. During the test sequence, the current calibration value of the voltage limit applied is shown in the display of the inverter. The voltage limit is increased successively until the shut- down threshold is achieved and the inverter disconnects from the grid.
  • Page 50: Maximum Frequency

    Commissioning SMA Solar Technology AG Maximum Frequency In the third step, the inverter tests the maximum frequency. During the test sequence, the frequency limit applied is shown in the display of the inverter. The frequency limit is reduced successively until the shut- down threshold is achieved and the inverter disconnects from the grid.
  • Page 51 SMA Solar Technology AG Commissioning Minimum Frequency In the last step, the inverter tests the minimum frequency. During the test sequence, the frequency limit applied is shown in the display of the inverter. The frequency limit is increased successively until the shut- down threshold is achieved and the inverter disconnects from the grid.
  • Page 52: Opening And Closing

    Opening and Closing SMA Solar Technology AG 7 Opening and Closing 7.1 Safety DANGER! Risk of lethal electric shock. Observe the following before opening the inverter: • Ensure the AC side is not live. • Ensure the DC side is not live.
  • Page 53 SMA Solar Technology AG Opening and Closing 4. Release all DC plug connectors with the help of a screwdriver: – Insert a screwdriver into one of the side slits (1). – Lever the screwdriver upward (2) and pull out the plug connector (3).
  • Page 54 Opening and Closing SMA Solar Technology AG 5. Ensure that there is no voltage at the DC plugs at the inverter. ☑ If there is a voltage present, check the installation. 6. Loosen all 6 lid screws and pull the lid forward to remove it.
  • Page 55: Closing The Inverter

    SMA Solar Technology AG Opening and Closing 8. Verify the absence of voltage L with respect to PE at the AC clamp with an appropriate meter. ☑ If there is a voltage present, check the installation. ☑ The inverter is now open and is not live.
  • Page 56 Opening and Closing SMA Solar Technology AG 2. Close all unnecessary DC inputs as described in section 5.4.4 ”Connecting the PV Generator (DC)” (page 34) to seal the inverter. 3. Check the Electronic Solar Switch for wear, as described in section 8.2  and attach it firmly.
  • Page 57: Maintenance And Cleaning

    SMA Solar Technology AG Maintenance and Cleaning 8 Maintenance and Cleaning 8.1 Checking Heat Dissipation 8.1.1 Cleaning the Fans If the fan grills are only soiled with loose dust, they can be cleaned using a vacuum cleaner. If you do not achieve satisfactory results with a vacuum cleaner, dismantle the fans for cleaning.
  • Page 58: Checking The Fans

    • Plug the provided jumper into the system control board. Setting Parameters 1. Request the installer password from the SMA Serviceline (contact: see page 85). 2. Set the "Fan-Test" parameter to "1" in the installer mode. 3. Check the fans' air flow.
  • Page 59: Cleaning The Air Grills

    SMA Solar Technology AG Maintenance and Cleaning 3. Close the inverter as described in section 7.3 ”Closing the Inverter” (page 55). 4. Check the fans' air flow. The inverter sucks air in from underneath and then blows it back out on the upper sides. Listen for any unusual noise, which could indicate incorrect installation or that the fans are faulty.
  • Page 60: Checking The Electronic Solar Switch (Ess) For Wear

    Maintenance and Cleaning SMA Solar Technology AG NOTICE! Risk of damage to the inverter if insects enter it! • The air grills must not be removed permanently, because otherwise the device is not protected against the entrance of insects! 8.2 Checking the Electronic Solar Switch (ESS) for Wear Check the Electronic Solar Switch for wear before plugging it in.
  • Page 61: Failure Search

    In the user manual provided, you will also find a description of the display messages during operation, the status messages and measuring channels. Do not try to carry out repairs other than those described here. Instead, use the SMA Solar Technology AG 24-hour replacement service (the inverter will be ready for dispatch within 24 hours and sent to a forwarding agency) and repair service 9.1 Blink Codes...
  • Page 62 • If the grid voltage is continually within the acceptable range and this error is still displayed, contact the SMA Serviceline Internal communication fault. Corrective measures • If this fault occurs often, contact the SMA Serviceline SMC6-8TL-IEN101040 Installation Guide...
  • Page 63 EEPROM data is defective, the device has switched off because the loss of data has disabled important functions of the inverter. Corrective measures • Contact the SMA Serviceline EeRestore One of the duplicate data sets in the EEPROM is defective and has been reconstructed without loss of data.
  • Page 64 Iac-DC_Offs-Srr A grid disturbance has occurred. Corrective measures • Check the grid conditions. • Contact the SMA Serviceline if this problem occurs often or several times in succession. IGBTs The internal hardware monitoring system has detected a fault in the power electronics.
  • Page 65 Description and corrective measure MSD-Vac Internal measurement comparison fault or hardware defect. Corrective measures • If this fault occurs often, contact the SMA Serviceline MSD-Timeout Internal measurement comparison fault or hardware defect. Corrective measures • If this fault occurs often, contact the SMA Serviceline Offset The "Offset"...
  • Page 66 Corrective measures • Check for ground faults in the PV generator as described in section 9.3.1 ”Checking the PV Generator for a Ground Fault” (page 68). • If this fault continues to occur, contact the SMA Serviceline Shutdown Temporary inverter fault. Corrective measures •...
  • Page 67 (operating parameters: Vac-Min and Vac-Max). • If the grid frequency is within the tolerable range, yet "Vac-Bfr," or "Vac-Srr" faults are still being displayed, please contact the SMA Serviceline VpvMax Overvoltage at DC input. The inverter may be damaged.
  • Page 68: Red Led Is Glowing Continuously

    Internal program run fault. Watchdog-Srr Corrective measures • If this fault occurs often, contact the SMA Serviceline 9.3 Red LED is Glowing Continuously If the red LED of the status display is continuously on during operation, there is either a ground fault in the PV generator or at least one of the varistors for the overvoltage protection is defective.
  • Page 69: Checking The Functioning Of The Varistors

    SMA Solar Technology AG Failure Search The approximate position of the ground fault can be determined from the ratio of the measured voltages between plus against ground potential and minus against ground potential. Example: The ground fault is between the second and third module in this case.
  • Page 70 ☑ There is a conductive connection. There is probably a different fault in the inverter. • Close the inverter as described in section 7.3 ”Closing the Inverter” (page 55). • Contact the SMA Serviceline (see section 13 ”Contact” (page 85)). ☑ There is no conductive The respective varistor is defective and must be replaced.
  • Page 71 ☑ This releases the terminals. If you do not receive an insertion tool for operating the terminal clamps with your replacement varistors, please contact SMA Solar Technology AG. As an alternative, the terminal contacts can be operated using a 3.5 mm wide screwdriver.
  • Page 72: Decommissioning

    Decommissioning SMA Solar Technology AG 10 Decommissioning 10.1 Dismantling the Inverter 1. Open the inverter as described in section 7.2 ”Opening the Inverter” (page 52). 2. Remove all cables from the inverter. 3. Close the inverter with the 6 screws and the corresponding tooth lock washers.
  • Page 73: Packing The Inverter

    Dispose of the inverter at the end of its service life in accordance with the disposal regulations for electronic waste which apply at the installation site at that time. Alternatively, send it back to SMA Solar Technology AG with shipping paid by sender, and labeled "ZUR ENTSORGUNG"...
  • Page 74: Technical Data

    Technical Data SMA Solar Technology AG 11 Technical Data 11.1 Sunny Mini Central 6000TL DC Input Maximum DC power at cos ϕ = 1 6,200 W Maximum DC voltage * 700 V DC max MPP voltage range 333 V … 500 V...
  • Page 75: Mechanical Data

    SMA Solar Technology AG Technical Data Test voltage (DC) 2.15 kV Test surge voltage 4 kV Surge testing voltage with serial interface 6 kV Internal consumption in night mode 0.25 W Mechanical data Width x height x depth 468 mm x 613 mm x 242 mm...
  • Page 76: Communication Interfaces

    Technical Data SMA Solar Technology AG Protective equipment All-pole DC switch-disconnector Electronic Solar Switch, DC plug system SUNCLIX DC overvoltage protection Thermally monitored varistors Personal protection (R > 1 M Ω ) Insulation monitoring Pole confusion protection Short circuit diode...
  • Page 77 SMA Solar Technology AG Technical Data Efficiency Peak efficiency η 98 % European efficiency η 97.7 % euro Installation Guide SMC6-8TL-IEN101040...
  • Page 78: Sunny Mini Central 7000Tl

    Technical Data SMA Solar Technology AG 11.2 Sunny Mini Central 7000TL DC Input Maximum DC power at cos ϕ = 1 7,200 W Maximum DC voltage * 700 V DC max MPP voltage range 333 V … 500 V DC nominal voltage...
  • Page 79 SMA Solar Technology AG Technical Data Surge testing voltage with serial interface 6 kV Internal consumption in night mode 0.25 W Mechanical data Width x height x depth 468 mm x 613 mm x 242 mm Weight 32 kg Climatic Conditions Extended temperature range * −...
  • Page 80 Technical Data SMA Solar Technology AG Communication Interfaces Bluetooth Optional RS485, galvanically isolated Optional Electronic Solar Switch Electrical service life in the event of a short circuit, A minimum of 50 switching operations with a nominal current of 35 A...
  • Page 81: Sunny Mini Central 8000Tl

    SMA Solar Technology AG Technical Data 11.3 Sunny Mini Central 8000TL DC Input Maximum DC power at cos ϕ = 1 8,250 W Maximum DC voltage * 700 V DC max MPP voltage range 333 V … 500 V DC nominal voltage...
  • Page 82 Technical Data SMA Solar Technology AG Surge testing voltage with serial interface 6 kV Internal consumption in night mode 0.25 W Mechanical data Width x height x depth 468 mm x 613 mm x 242 mm Weight 33 kg Climatic Conditions Extended temperature range * −...
  • Page 83 SMA Solar Technology AG Technical Data Communication Interfaces Bluetooth Optional RS485, galvanically isolated Optional Electronic Solar Switch Electrical service life in the event of a short circuit, A minimum of 50 switching operations with a nominal current of 35 A...
  • Page 84: Accessories

    SMA Solar Technology AG 12 Accessories You will find the corresponding accessories and replacement parts for your product In the following overview. If required, you can order these from SMA Solar Technology AG or your dealer. Description Brief description SMA order number...
  • Page 85: Contact

    SMA Solar Technology AG Contact 13 Contact If you have technical problems concerning our products, contact the SMA Serviceline We require the following information in order to provide you with the necessary assistance: • Inverter type • Inverter serial number • Type and number of PV modules connected •...
  • Page 86 Contact SMA Solar Technology AG SMC6-8TL-IEN101040 Installation Guide...
  • Page 87: Exclusion Of Liability

    The use of supplied software produced by SMA Solar Technology AG is subject to the following conditions: • SMA Solar Technology AG rejects any liability for direct or indirect damages arising from the use of software developed by SMA Solar Technology AG. This also applies to the provision or non-provision of support activities.

This manual is also suitable for:

Sunny mini central 7000tlSunny mini central 8000tl