Extreme Networks E4G Series Hardware Installation Manual page 85

Hide thumbs Also See for E4G Series:
Table of Contents

Advertisement

Replacing a DC Power Supply in the E4G-400 Router
5 Slide the cover into place over the terminal block
(Figure
60).
Figure 60: Connecting the DC Power Cables (Part 2)
RTN
-48V
(+)
(–)
SH_211
6 Connect the cables to the DC source voltage, using hardware appropriate to the installation site and
following local and national electrical codes.
7 Energize the DC circuit.
Leave the ESD strap permanently connected to the rack, so that the strap is always available when you
need to handle ESD-sensitive components.
E4G Series Routers Hardware Installation Guide
85

Advertisement

Table of Contents
loading

Table of Contents