Separation

The stereo "sound field" can be reduced by 3 dB or 6 dB to suppress processing-induced multipath that can occur in
certain terrain and within certain transmission systems when heavy processing is used. When a setting of -3 dB or -6
dB is used, the amount of L-R (perceived stereo effect) is also reduced. However in difficult RF signal coverage
areas, the amount of perceived multipath is reduced as well, resulting in the perception of a much cleaner overall
signal with better penetration and coverage. The Omnia-6 defaults to a setting of Stereo, using the full L-R signal.
We suggest that you leave it in that mode, but the other settings are available for those who wish to experiment,
including a setting of Mono.

Schedule

Schedule Submenu

Schedule List

Previously saved Schedule files are listed in the window. To select a schedule, highlight and click on the schedule
name.

New

Used to create a new Schedule. Highlight and click on New to open the Modify Schedule window and create a new
Daypart Schedule.

Modify and Remove

Used to modify or remove an existing schedule. Highlight and click on the Schedule List, then highlight and click
on the Daypart Schedule you wish to modify. Highlight and click on Modify or Remove. Modify will open up the
Modify Schedule window and allow you to modify the settings of the selected daypart. Remove will bring up a
confirmation dialog asking if you want to delete the selected daypart. Answering Yes to the prompt permanently
deletes that Schedule from the system memory.

Load from Card

Retrieves Schedule/Daypart data stored on the Omnia PC Card. This operation will restore any dayparts that were
previously saved to the card with the Save to Card operation, described next.
Omnia-6ex Use and Operation Manual – V: 1.10
43
This submenu allows you to create and maintain
Schedules (Daypart Tables). A schedule is used to
automatically load or change presets according to
the day and/or time of day. The start day can be any
specific day of the week, weekdays (M-F),
weekends (S-S), or every day (All). All dayparts
must end within a 24-hour period. Over 450
individual events can be programmed within a 7-day
interval.