Horizontal Installations-Left Side Down - Whirlpool WGFM29 Installation Instructions Manual

93% and 95% 2-stage variable-speed gas furnace
Table of Contents

Advertisement

2. Secure Hose A to the front cover drain tap with a red hose
clamp.
3. Route Hose A to the rear right (down) side panel grommet
holes.
4. Cut ¹⁄₄" (6.4 cm) from the end of the drain port on the
externally mounted rubber elbow. Discard cut portion.
5. Insert Tube 1 into the rubber elbow drain port and secure with
a silver hose clamp.
NOTE: Angle tube outward toward front of furnace.
6. Cut 17³⁄₄" (45.1 cm) from the long end of Hose B. Discard cut
portion.
7. Secure the remaining end of Hose B to exposed end of Tube
1 with a green hose clamp.
8. Route Hose B to the front right (down) side panel grommet
holes.
9. Cut 5¹⁄₂" (14 cm) straight length from the long end of each
Tube 2. Discard the radius pieces.
10. Insert approximately 1" (2.5 cm) of each Tube 2 through the
right (down) side panel grommet holes.
11. Secure the tubes to Hose A and Hose B using the green hose
clamps.
NOTE: Ensure that the hoses and tubes maintain a
downward slope for proper drainage and are not kinked or
bound.
For details concerning the mounting of the drain trap, refer to
"Horizontal Drain Trap Mounting" in "Condensate Drain Lines and
Drain Trap."
Horizontal Upflow Connections—Right Side Down
(Counterflow Similar)
A
M
L
K
H
J
I
A. Front cover drain port
B. Front cover pressure tap
C. Right side panel
D. Rubber elbow
E. Rubber elbow drain port
F. Silver hose clamp
G. Tube 1
Horizontal Installations—Left Side Down
Horizontal installations with the left side panel down will require
the drain hoses to be connected to the left side front cover drain
port and the side drain port on the rubber elbow.
1. Remove the rubber plug/cap from the front cover left (down)
side drain port.
22
B
D
C
H
G
F
E
H. Green hose clamps (3)
I. Drain trap
J. Tubes 2
K. Hose B
L. Hose A
M. Red hose clamp
2. Relocate the front cover pressure switch hose connection
from the right side (as shipped) pressure tap to the left (down)
side tap.
NOTE: The pressure switch hose must be connected to the
down side to guard against blocked drain conditions. Cut the
hose to the appropriate length to minimize sagging. Plug the
right (unused) pressure tap with the rubber plug removed
from the left side.
3. Secure Hose A to the front cover drain port with a red hose
clamp.
4. Route Hose A to the rear left (down) side panel grommet
holes.
NOTE: For left side drainage, grommets must be relocated to
the left side panel.
5. Remove the rubber cap from the side drain port on the rubber
elbow.
6. Secure the short end of Hose B to the rubber elbow side
drain port using a green hose clamp.
NOTES:
For left side drainage, route Hose B to the far left (down)
side panel grommet holes.
Horizontal left side connections (when using a new side
port drain elbow) does not require connecting a hose to
the induced draft blower housing.
7. Cut 5¹⁄₂" (14 cm) straight length from the long end of each
Tube 2. Discard radius ends.
8. Insert approximately 1" (2.5 cm) of each Tube 2 through the
left side panel grommet hole.
9. Secure the tubes to Hose A and Hose B with the green hose
clamps.
NOTE: Tube must reach bottom of trap.
NOTE: Ensure that the hoses and tubes maintain a downward
slope for proper drainage and are not kinked or bound.
For details concerning the mounting of the drain trap, refer to
"Horizontal Drain Trap Mounting" in this section.
Horizontal Upflow Connections—Left Side Down
(Counterflow Similar)
C
J
A. Induced draft blower drain port
B. Hose B
C. Green hose clamps (3)
D. Side panel grommet holes
E. Tubes 2
A
B
C
D
E
I
H
G
C
D
E
F
F. Drain trap
G. Hose A
H. Red hose clamps
I. Front cover drain port
J. Left side panel

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wgfd29Gold wgfd295Gold wgfm295

Table of Contents