Rules For Safe Installation - Dunkirk Empire II Installation & Operation Manual

Dunkirk empire ii oil-fired cast iron hot water boiler
Table of Contents

Advertisement

RULES FOR SAFE INSTALLATION
AND OPERATION
1.
Read the Owner's
Manual
for Safe Operation
carefully.
Failure to follow the rules for
safe operation and the instructions
can cause a malfunction
of the boiler and result in death,
serious bodily injury, and/or property damage.
2. Check your local codes and utility requirements
before installation.
The installation
must
be in accordance
with their directives,
or follow NFPA 31 - Installation
of Oil Burning
Equipment,
latest revision.
3. Before servicing,
allow boiler to cool. Always shut off any electricity
and oil to boiler when
working on it.
4. Inspect oil line and connections
for leaks.
5. Be certain oil burner nozzle is the size required.
Overfiring
will result in early failure of the
boiler sections.
This will cause dangerous
operation.
6. Never vent this boiler into an enclosed
space. Always vent to the outside. Never vent to
another room or inside a building.
7. Be sure there is adequate
air supply for complete
combustion.
8. Follow a regular service and maintenance
schedule for efficient
and safe operation.
9. Keep boiler area clean and free of combustible
material,
gasoline and other flammable
vapors and liquids.
10. Oil burners are not do-it-yourself
items. This boiler must be installed and serviced
by
qualified professionals
using combustion
test instruments.
11. Be aware when piping the relief valve that if the system pressure exceeds
the safe limit
of 30 pounds per square inch, the relief valve will automatically
lift open. Lifting of the
relief valve can discharge
large quantities
of steam and hot water, which may damage
the surroundings.
Before installing the relief valve read the manufacturer's
instructions
and maintenance
section of the manual on relief valves.
12. Installation
and sizing of the expansion
tank must consider the heating systems total
water volume, temperature,
boiler initial fill pressure,
and system arrangement.
An im-
properly installed and sized expansion
tank may result in frequent
lifting of the relief valve
or other heating system problems.
For proper installation,
sizing, and maintenance
of the
expansion
tank follow the guidelines
established
by Dunkirk Boilers and the expansion
tank manufacturer.
13. Expansion
tank performance
and life expectancy
can be hindered
by overfilling the boiler.
Dunkirk Boilers recommends
an initial fill pressure of 10-12 psig. For higher fill pressures
the expansion
tank's air charge will need to be increased
to match the fill pressure.
Consult the manufacturer's
guidelines
for sizing and selection.
14. Purging the heating system of air and gases when first putting the boiler into service is
critical for proper circulation
and quiet performance.
Once the air and gases are purged,
for boiler installations
using float type vents, the air vents should be closed for normal
operation.
If air is heard or noticed by a loss of heat, purge the system and open the
vents for a short period of time.
WARNING
This boiler has been designed
for residential
installations.
If used for commercial
applications,
all jurisdictional
requirements
must
be met.
This
may
require
wiring
and/or
piping
modifications.
The manufacturer
is not responsible
for any changes
to the original
design.
I
DO NOT USE GASOLINE
CRANKCASE
DRAININGS
OR ANY OIL CONTAINING
GASOLINE.
I

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents