Installation Procedure - Dunkirk XEB II Series Installation, Operation & Maintenance Manual

Gas-fired hot water induced draft boilers
Table of Contents

Advertisement

WARNING
!
Improper installation, adjustment, alteration, service
or maintenance could result in death or serious
injury
.
Installation must conform to requirements of authority
1.
having jurisdiction or, in absence of such requirements,
to the National Fuel Gas Code, ANSI Z223.1/NFPA 54.
Where required by authority having jurisdiction,
2.
installation must conform to the Standard for Controls
and Safety Devices for Automatically fi red Boilers,
ANSI/ASME CSD-1.
Boiler series is classifi ed as Category I. Vent
3.
installation shall be in accordance with "Venting of
Equipment ," of the National Fuel Gas Code, ANSI
Z223.1/NFPA 54, or applicable provisions of local
building codes.
Boiler has met safe lighting and other performance
4.
criteria with gas manifold and control assembly on
boiler per latest revision of ANSI Z21.13/CGA 4.9.
Install such that gas ignition system components are
5.
protected from water (dripping, spraying, rain, etc.)
during appliance operation and service, (circulator
replacement, condensate trap, control replacement,
etc.).
Locate boiler on level, solid base as near chimney as
6.
possible and centrally located with respect to heat
distribution system as practical.
Verify you have the right size boiler before starting
7.
installation. See rating and capacity table.
When installed in utility room, door should be wide
8.
enough to allow largest boiler part to enter, or to
permit replacement of another appliance such as water
heater.
Boiler installed in building under construction, take
9.
care to insure clean combustion air supply during
construction process. Airborne particulates such as
from drywall dust and from fi berglass insulation can
clog burner ports and cause incomplete combustion and
sooting.
WARNING
!
Fire hazard. Do not install boiler on combustible
fl ooring or carpeting. Failure to follow these
instructions could result in death or serious injury.
FOR INSTALLATION ON NON-COMBUSTIBLE
10.
FLOORS ONLY - For installation on combustible
fl ooring special base must be used. (See Replacement
Parts Section.) Do Not Install Boiler on carpeting.
Verify boiler is supplied with correct type of gas, fresh
11.
air for combustion, and suitable electrical supply.

INSTALLATION PROCEDURE

Follow local regulations with respect to installation
of CO detectors.
Figure 1 - Minimum Clearances To Combustible
Table 1 - BOILER MINIMUM CLEARANCE TO
Flue/Vent Connector
Set unit on concrete or other noncombustible material
base or fl oor. DO NOT INSTALL ON CARPETING.
5
NOTICE
Construction
6"
8"
Rear
6"
Boiler
Front
18"
COMBUSTIBLES
Unit
Top
Rear
Control Side
Opposite Side
Front (Alcove)
Near Boiler Piping
8"
Minimum
Clearances
6" (152mm)
6" (152mm)
8" (203mm)
6" (152mm)
18" (457mm)
6" (152mm)
1" (24mm)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xeb-2Xeb-3Xeb-4Xeb-5Xeb-6Xeb-7

Table of Contents