Foroil-firedboilersfor connectionsto ventsor chimneys,vent installations shall be in
accordancewith applicableprovisionsof INSTALLATION OF OIL BURNINGEQUIPMENT,
NFPA-31- latestrevision,andapplicableprovisionsof localbuildingcodes.
CHIMNEYAND
CHIMNEY
CONNECTIONS
This is a very important
part of your heating system.
No boiler, however efficient
its design,
can perform
satisfactorily
if the chimney
that serves it is inadequate.
Check your chimney
to
make certain that it is the right size, properly constructed
and in sound condition.
It is cheaper to rebuild a poor chimney
than to pay excessive
fuel bills. If yours is an old
chimney, a new steel liner or a new prefabricated
chimney
may be the best solution.
The
following chart shows recommended
minimum chimney sizes based on Table 3 and Figure 6
of the I=B=R Testing and Rating Standard for Heating Boilers, Sixth Edition, June 1989.
RECOMMENDED
MINIMUM CHIMNEY
SIZES
FIRING RATE
(gph)
0.60-
1.30
1.31 - 1.80
1.81 - 2.00
For elevations
abo,
CHIMNEY
HEIGHT
(ft)
15
15
2O
NOMINAL
CHIMNEY
8" x 8"
8" x 8"
8" x 8"
2,000 feet above sea level, a_
ROUND LINER-
INSIDE
6"
7"
8"
d 3 feet to the chimn
SQUARE
LINER-
INSIDE
6_3/4,, x 6_3/4,,
6_3/4,, x 6_3/4,,
6_3/4"x 6_3/4-
y heights.
For additional
chimney design and sizing information,
consult the ASHRAE
1996 HVAC
Systems
and Applications
Handbook,
Chapter 30, Gas Vent and Fireplace Systems;
or the
National Standard for Chimneys,
Fireplaces,
Vents and Solid Fuel Burning Appliances,
ANSI/
NFPA211.
CHIMNEY
CONNECTOR
AND DRAFT REGULATOR
Venting the boiler requires a 6" diameter
chimney
connector
pipe and using the draft
regulator
packed with the boiler. Properly
installed,
the regulator
will control the draft
automatically.
It is better to install it in a horizontal
section of pipe, but it may be installed in
an angled or vertical section of pipe. Make certain that the "top" of the regulator
is at the top
- and that the short pipe section which holds the vane is horizontal.
Even though locating the
draft regulator close to the chimney reduces noise, install
the draft regulator
as close as
practicable
to the boiler.
To install the chimney
connector,
start at the boiler with a vertical pipe and then elbow - then
install the draft regulator
making it horizontal.
When the regulator
is in place, start at the
chimney
and work back to the regulator.
Join the two sections with a drawband.
The
horizontal
pipe must slope up toward the chimney at least 1/4 inch per linear foot of venting.
The chimney connector
must not leak and must be firmly supported.
Join each of the
sections with at least two sheet-metal
screws. Support every second section with a
stovepipe
wire.
Maintain a minimum
vent pipe clearance
of 18" from the surface of the vent to wood
and other combustible
materials.
14