Wall Exit Clearance Factory Built Chimney; Masonry Chimney - Regency F5100 Owners & Installation Manual

Freestanding woodstove
Table of Contents

Advertisement

WALL EXIT CLEARANCE FACTORY BUILT CHIMNEY

When a metal prefabricated chimney is used, the manufacturer's installation instructions must be followed. You must also purchase and install the ceiling
support package or wall pass-through and "T" section package, fi restops (where needed), insulation shield, roof fl ashing, chimney cap, etc. Maintain proper
clearance to the structure as recommended by the manufacturer. The chimney must be the required height above the roof or other obstructions for safety and
proper draft operation.
Minimum vertical of 36" before any offset.
Horizontal Maximum of 36" with 1/4" rise per foot.
NOTE: Recommend using 2-45º instead of 90º to improve draft
and performance.

MASONRY CHIMNEY

Ensure that a masonry chimney meets the minimum standards of the
National Fire Protection Association (NFPA) by having it inspected
by a professional. Make sure there are no cracks, loose mortar or
other signs of deterioration and blockage. Have the chimney cleaned
before the stove is installed and operated. When connecting the
stove through a combustible wall to a masonry chimney, special
methods are needed.
Minimum vertical of 36" before any offset.
Horizontal Maximum of 36" with 1/4" rise per foot.
NOTE: Recommend using 2-45º instead of 90º to improve draft
and performance.
F5100 Regency Freestanding Woodstove
6"
[152mm]
Min. 36"
Vertical
Rise
6"
[152mm]
Min. 36"
Vertical
Max. 36"
Rise
Horizontal
INSTALLATION
Max. 36"
Horizontal
10"
[254mm]
10"
[254mm]
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

F3500

Table of Contents