must be prohibited near battery. In addition, it is recommended to prohibit smoking in
all areas where equipment is placed.
l
The lab must comply with national Level 2 fire protection standard.

3.3 Power Supply Requirements Inspection

l
Nominal voltage of power supply provided for ZXR10 ZSR router by power device in
lab is -48V and the allowed variation range is -57V~-40V.
Noise level index of the DC voltage must comply with general technical specifications
issued by the former MPT.
DC power supply must have over-voltage/over-current protection and indications.
l
AC Power Supply Requirements
100V~240V, 50Hz~60Hz, wave distortion <5%.
Voltage frequency requirements to standby electric generator are same as those listed
above but its wave distortion range is 5%~10%.

3.4 Grounding Inspection

Ground wires in the lab must be laid radially or in plane mode and ground wires must be
laid separately. Electric circuits formed by reinforcing steel bars used in the building or
through cabinet are not allowed.
In case of compound grounding, the earthing resistance must be less than 1Ω. The
cross-sectional area of grounding wire is determined by the Max permissible current. The
grounding wire must be sheathed copper wire instead of bare copper wire.

3.5 Auxiliary Equipment Inspection

l
DDF and ODF frames related to this project must have been installed. The capacity
must be sufficient and all optical cables must have been laid.
l
Power supply must be prepared and its capacity is sufficient for this project.
l
Transmission equipment related to this project must have been prepared.
l
Terminal device must be equipped with a dedicated terminal console, the installation
position of which must be correct and comply with lab layout requirements.

3.6 Required Tools

Before installing device, the following basic tools and instruments must be prepared in
advance.
l
Common Tools
Marking tools
à
Long rolled tape, ruler (1m), marking pen and scribe
SJ-20110803091932-002|2011-08-30 (R2.0)
Chapter 3 Installation Preparation
3-5
ZTE Proprietary and Confidential