Verifying The Module Is Installed Correctly - HP ProCurve 2910al Series Installation And Getting Started Manual

Hide thumbs Also See for ProCurve 2910al Series:
Table of Contents

Advertisement

Installing the Switch
Installation Procedures

Verifying the Module is Installed Correctly

Observe the Module Status and Fault LEDs on the front of the switch to verify
the module is installed properly.
Figure 2-8. Location of Module Status LEDs
LED Behavior
2-10
Module Status LED
ProCurve Switch
2910bl-24G-PoE
J9146A
PoE+
Power
Fault
Status
Locator
PoE
LED
Mode
Tmp
Fan
Test
Console
Reset
When the module is installed properly and the switch is powered on, or
the module is installed when the switch already has power, the module
undergoes a self test that takes a few seconds. You can use the LEDs to
determine that the module is installed properly and has passed the self
test, as described in the "LED Behavior" table below.
LED
Display for a Properly Installed Module
Mdl Status on the
The LED goes ON as soon as the module is installed and the switch
front of the switch
is powered on, and stays ON steadily.
Fault on the front of
OFF normal state, no fault condition exist.
the switch
Mdl Status on the
The LED goes ON as soon as the module is installed and the switch
module
is powered on, and stays ON steadily.
Link (on the module)
The LED goes ON to indicate the port is enabled, connected and
detects a signal from the attached device.
Mode (on the module) The LED will flicker when traffic is detected on the port and the port
is transmitting and/or receiving packets.
Status of the Back
Mdl
EPS
RPS
*
Spd mode:
off = 10 Mbps
2 flash = 100 Mbps
Act
on = 1 Gbps
FDx
3 flash = 10 Gbps
Spd
*
PoE
Usr
Auxiliary Port
Clear