**IMPORTANT NOTE: All vent pipes must be glued, properly
supported, and the exhaust must be pitched minimum of a
1/4" per foot back to the boiler (to allow drainage of
condensate).
Figure 5.5:3" " Roof Vent with Tee (Intake) &
Coupling (Exhaust)
DIAGRAMS FOR VERTICAL VENTING
**IMPORTANT NOTE: All vent pipes must be glued, properly
supported, and the exhaust must be pitched minimum of a
1/4" per foot back to the boiler (to allow drainage of
condensate).
Figure 5.6:3" " Roof Vent with 3" " Concentric
Vent Kit (KGAVT0601CVT)
VENTING
17