VENTING
**IMPORTANT NOTE: All vent pipes must be glued, properly
supported, and the exhaust must be pitched minimum of a
1/4" per foot back to the boiler (to allow drainage of
condensate).
Figure 5.1:3" " Sidewall Vent with Tee (Intake) &
Coupling (Exhaust)
**IMPORTANT NOTE: All vent pipes must be glued, properly
supported, and the exhaust must be pitched minimum of a
1/4" per foot back to the boiler (to allow drainage of
condensate).
Figure 5.3:3" " Sidewall Vent with V1000 Kit
16
DIAGRAMS FOR SIDEWALL VENTING
BOILER
INTAKE
3"
3"
T & P
EXHAUST
EXHAUST OUTLET
RIGHT SIDE VIEW
**IMPORTANT NOTE: All vent pipes must be glued, properly
supported, and the exhaust must be pitched minimum of a
1/4" per foot back to the boiler (to allow drainage of
condensate).
Figure 5.2:3" " Sidewall Vent with Tee (Intake) &
Coupling (Exhaust)
**IMPORTANT NOTE: All vent pipes must be glued, properly
supported, and the exhaust must be pitched minimum of a
1/4" per foot back to the boiler (to allow drainage of
condensate).
Figure 5.4:3" " Sidewall Vent with 3" " Concentric
Vent Kit (KGAVT0601CVT)
8
8
8
STRAIGHT
COUPLING
TEE (VERTICAL)
TEE (VERTICAL)
FRONT ELEVATION
(MULTIPLE VENTS)
EXTERIOR
WALL
1" MIN.
EXHAUST
12"
TEE
MINIMUM
STRAIGHT
3"
COUPLING
INTAKE
REFER TO MANUAL
FOR PROPER CLEARANCES
GROUND LEVEL
SIDE ELEVATION